Beginning at 10 p.m., the bridge will be closed due to routine inspections by personnel with the Oregon Department of Transportation.
The areas affected include I-5 southbound between I-405 and the Marquam Bridge, as well as the I-5 northbound ramp to eastbound I-84.
The full closures go from 10 p.m. to 5 a.m. with completion expected by the morning of Friday, April 24.
ODOT says all Portland bridges are inspected every two years and as a result, more closures will be scheduled throughout the spring and summer.
FORT WAYNE, Ind. (WOWO) — After President Trump signaled support for suspending the 18-cent federal…
INDIANAPOLIS, Ind. (WOWO) — Katherine Legge will become the first woman to try and complete…
The U.S. Capitol is pictured on March 3, 2026. (Photo by Jennifer Shutt/States Newsroom)WASHINGTON —…
The U.S. Capitol is pictured on March 3, 2026. (Photo by Jennifer Shutt/States Newsroom)WASHINGTON —…
The U.S. Capitol is pictured on March 3, 2026. (Photo by Jennifer Shutt/States Newsroom)WASHINGTON —…
A firefighter watches as the Gifford Fire burns on Aug. 6, 2025, in Los Padres…
This website uses cookies.